
Week 22 - 293 days to opening night
I'm moving. So I'm packing. And dumping. And sorting. And tipping. Plus we've been sorting stuff for the Xmas show, so it's been a bit of a light week on the ol' Mack & Mabel front. But I have been building set models, and overture models, and a couple of other bits'n'bobs, so it's not been a complete washout.
And talking of 'building' (Oh Neil, nii-ice segueway into the next topic) we seem to be building a bit of interest now inside and outside the group which is good, the more people want to be part of it the better the production - plus there are only 3 or 4 big productions going on in the area next year - particularly as it seems that Theatre2000 have pulled out from doing 'Beauty and the Beast' (and I don't blame them - you'd need some serious money to put that show on).
Had a bit of a brainwave about the ending of the show this week - it ends on a real low, which can work in a lot of cases, but the script in this case is very clunky at the end, so it needs a bit of work to make the whole thing flow to a natural conclusion - and I think I've sorted it - but it does mean a lot of work for me to do first. Plus we're not just leaving it on that low as we'll have a reprise of the overture which will include some vigorous dance and the curtain calls built in.
Anyway, gotta get back to putting my life into cardboard boxes.
Neil 
 
 
 
 
 Posts
Posts
 
 
No comments:
Post a Comment