Week 22 - 293 days to opening night
I'm moving. So I'm packing. And dumping. And sorting. And tipping. Plus we've been sorting stuff for the Xmas show, so it's been a bit of a light week on the ol' Mack & Mabel front. But I have been building set models, and overture models, and a couple of other bits'n'bobs, so it's not been a complete washout.
And talking of 'building' (Oh Neil, nii-ice segueway into the next topic) we seem to be building a bit of interest now inside and outside the group which is good, the more people want to be part of it the better the production - plus there are only 3 or 4 big productions going on in the area next year - particularly as it seems that Theatre2000 have pulled out from doing 'Beauty and the Beast' (and I don't blame them - you'd need some serious money to put that show on).
Had a bit of a brainwave about the ending of the show this week - it ends on a real low, which can work in a lot of cases, but the script in this case is very clunky at the end, so it needs a bit of work to make the whole thing flow to a natural conclusion - and I think I've sorted it - but it does mean a lot of work for me to do first. Plus we're not just leaving it on that low as we'll have a reprise of the overture which will include some vigorous dance and the curtain calls built in.
Anyway, gotta get back to putting my life into cardboard boxes.
Neil
No comments:
Post a Comment